The generator is then step loaded with the load bank until the desired load level is reached.
Generator load bank testing procedure.
The recommended procedure to follow for the load bank test would be to start and run the generator until the water temperature stabilizes.
Perform a stepped load bank test.
Start the generator and allow it to reach the normal temperature.
If a generator fails the monthly test it should be operated under a load supplied by a load bank i e.
6 4 4 1 1 2 specifies that the 10 second criterion does not apply during the monthly testing of the generator.
Our test procedures include load test generator set for a minimum of 1 or 2 or 4 consecutive hours.
Start and run the generator until the water temperature stabilizes.
Step load the generator with the load bank until the desired load is reached.
Load bank testing for two continuous hours each year.
Transfer all manual or automatic transfer switches to the emergency source.
Load bank testing is a standard part of our preventative maintenance service agreements and is accomplished without any interruption to facility operations.
Transfer all manual or automatic transfer switches to the emergency source.
The last hour cannot be less than 75 of the emergency generator nameplate kw rating for a total of 4 continuous hours.
These are some of the steps to test a load bank testing.
1 volts and amps on each phase voltage unbalance between phases shall.
Duration of actual test varies based on type of test nfpa 110 and customer preference.
During this two hour period the unit should be operated as follows.
Step load the generator with the load bank until the desired load is reached.
Standard load bank testing procedure the following is the basic step by step procedure for performing load bank testing on a generator set by utilizing a portable resistive load bank unit.
O engine exhaust temperature during test if applicable p kw load under test q identification of unsatisfactory conditions and corrective action taken including parts replaced note.
After the test the technician removes the load bank load first and transfers all switches back to the normal position before allowing the generator to cool down according to manufacturer guidelines.
At 25 of the nameplate kilowatt rating for 30 minutes.
Check all fluids level in the generator.
As a minimum the following shall be observed and recorded at 25 50 80 and 100 stepped load during testing of diesel generators on site.
1 apply load in steps used for generator sizing design consultant specify.
Run at 80 of rating with 100 verification or as described in service agreement.
At 50 of the nameplate kilowatt rating for 30 minutes.