It verifies that all primary components of the generator set are in proper working condition.
Generator load bank test requirements.
Remove the load bank load first after the test.
A load bank can be connected to the generator to get above the 30 requirement.
O engine exhaust temperature during test if applicable p kw load under test q identification of unsatisfactory conditions and corrective action taken including parts replaced note.
Any examples are for illustrative purposes only.
8 4 2 3 has special requirements for diesel generators that can t meet the minimum exhaust temps or 30 load requirements.
During this two hour period the unit should be operated as follows.
For example if a generator is used as a backup for services associated with loss of life or serious injury such as in a hospital setting the testing requirements are much more frequent.
The only compliance reason you would be performing the load bank exercise is if the engine was less than 30 loaded during the monthly tests.
8 2 4 3 if a generator fails the monthly test it should be operated under a load supplied by a load bank i e.
Start and run the generator until the water temperature stabilizes.
The testing for an annual load bank test and the triennial exercise may be combined according to nfpa 110 2010.
The equipment used to conduct a load bank test produces artificial loads on the generator by bringing the engine to an appropriate operating temperature and pressure level.
At 25 of the nameplate kilowatt rating for 30 minutes.
Can the generator load bank test be combined to meet the 36 month test as well as the 4 hour load test.
2 in lieu of nfpa 110 5 13 2 3 h i hook up the dry type load bank to generator and perform a stepped load test on the generator at 25 50 80 and 100 of the nameplate kw rating of the generator.
A generator load bank test involves an examination and assessment of a genset.
6 4 4 1 1 2 specifies that the 10 second criterion does not apply during the monthly testing of the generator.
1 1 1 power systems covered in this standard include power sources transfer equipment controls supervisory equipment and all related electrical.
Transfer all manual or automatic transfer switches to the emergency source.
Each step to last fifteen 15 minutes record engine and generator data as detailed later in this section.
Step load the generator with the load bank until the desired load is reached.
This standard contains requirements covering the performance of emergency and standby power systems providing an alternate source of electrical power to loads in buildings and facilities in the event that the primary power source fails.
Load bank testing for two continuous hours each year.